Flat Nylon Dog Recall Lead Black (1" X 7M Long)

ideal for recall training

$26.79
RRP $41.99
SAVE $15.20 (36%)
In Stock

Auto Delivery

How auto delivery works.

Select the frequency and your items will be delivered to you as often as you prefer. 

  • Enjoy ongoing savings on every order
  • Set and forget - Convenient, repeat deliveries - straight to your door
  • No sign-up fee or contract, you can edit or cancel any time

For more information click here 


Make 4 payments of $6.70 over 8 weeks and get it now!


Calculate Shipping


1" x 7m long

  • This lead is great for letting your dog roam in the park or beach while still maintaining control
  • The lead also folds neatly when not in use
  • swivel snap hook, padded hand loop and two additional padded hand grips is ideal for recall training. Extra hand grips are situated 8cm and 21cm from the hand loop.

(28-4840BK)

SKU 28-4840BK
Barcode # 9328073019547
Brand Prestige Pet
Shipping Weight 0.3000kg

Write a product review

7mtr nylon lead

By: Jane on 12 December 2019
Fantastic for down the beach + in the parks he can still have a walk + l can keep control especially with other dogs around . Love the padded handle very comfortable + the strenght in the lead itself no dog would ever be able to break it . Also the heavy duty clip to attach to collar is solid . Thanku Vet Shed for a qaulity product for the money .
(5)

Flat nylon long lead

By: Jane on 1 August 2019
Thanks for the lead but it’s to long I didn’t read it Wright
(5)

Others Also Bought



More From This Category


[%/site_value%]