Rogz Control Extra Large Long Lead 1.2m
available in 4 colours
Rogz Shock Absorbing Leads reduce strain on your hands and on your dog
Designed for strong erratic pullers, the Control Lead absorbs the pull pressure along the surface of the soft bungee webbing which extends and retracts according to your dog's behaviour, minimizing the risk of injury to you or your dog.
Shoc Loc : shock absorbing webbing: Rogz has designed the world’s first ShocLoc system. With our dual function lock system, it provides an option to reduce pull load and pressure when the ShocLoc system is not locked out. However when you want to maintain close control, lock the ShocLoc system out, to prevent the bungee from stretching
Reflective Stitching
Soft nylon
Snap Loc Trigger Hook: Why have a SnapLoc Trigger? Rogz has designed the world’s first SnapLoc system, to avoid accidental opening of the Trigger Hook to maintain control while out with your dog. This additional control feature prevents accidental release and break-away
Waste Bag Holder: Additional accessories are easily accessible for your convenience: A waste bag holder, keys and a Rogz ID Tag plastic D-ring.
Lumberjack Long Lead UtilityControl Lead 25mm width - 1.2m length for Gentle to Strong Pull Behaviour
4 great colours
sold separately
p>
(HLLOC25)
SKU | HLLOC25 |
Brand | Rogz |
Shipping Weight | 0.2000kg |
Be The First To Review This Product!
Help other The Vet Shed users shop smarter by writing reviews for products you have purchased.